    Supply Chain Business Solutions offers Preactor Advanced Planning and Scheduling software for Production Planning and Production Scheduling.
     
    Preactor Advanced Planning System helps in effective scheduling of production helping manufacturing companies to minimise work in progress inventories and reduce manufacturing costs. Preactor is a constraints based production scheduling solution that will help manufacturing businesses schedule production to best meet customer demands while achieving business objectives such as minimise work in process inventories, minimise costs by doing things such as minimise changeovers or optimising schedules in other ways.
     
    So successful has Preactor’s breakthrough technology been that the number of companies using the product recently reached the 4,500 mark, more than any of our competitors. These companies are a mix of small and medium sized as well as large corporations located in 88 countries.
     
    Preactor can be configured as constraints based detailed production scheduling software as well as a production planning software.
     
    Detailed Scheduling software is an important tool for many companies where it can have a major impact on the productivity of a process. In manufacturing, the purpose of scheduling is to minimize the production time and costs, by telling a production facility what to make, when, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce costs.
     
    Our Solutions  production planning and scheduling solutions clip image001 
     
    The basic difference between planning software and scheduling software is that planning systems are ‚bucketed (monthly, weekly, daily) and cannot preserve operation sequences within the time bucket. True scheduling systems are bucket less, preserving sequencing, and capable of generating work-to or dispatch lists. Assignment of operation to resource is a key function to achieve operational efficiency and optimizing performance.
     
    Detailed scheduling uses a shorter time horizon and a much more detailed process route than a planning system.‚ Typically the input would be manufacturing orders which have a process route associated with each defining the operation steps to make the product.‚ The user then can load the orders onto individual resources using scheduling rules and interact with the schedule using the Gantt charts and plots that are generated.‚ A typical output would be a dispatch list for each resource.
     
    An important feature of any scheduling tool is the ability to customise it to meet the unique needs of each application.‚ Templates can help to get the user to 80% of the requirements but to get the last 20% it s important to be able to tailor the tool to fit.
     
    Planning Software
    Preactor takes a breakthrough approach to the planning process. Whereas most planning systems use a spreadsheet type grid to calculate the production load with some simple load levelling to push overloads from one week to the next, Preactor s uses its detailed scheduling roots to search for available capacity.
     
    Our Solutions  production planning and scheduling solutions clip image002
     
    When used in a long term planning system Preactor is set up with a high level model of the process. The forecast demand is usually planned at SKU (finished product) level and the process capacity is typically represented as weekly or daily ‚buckets of capacity , with the resources representing departments, cells, plants or entire factories. The inputs to the planning system are the forecast demand, initial stock and the target stock level required at the end of each day or week. The target stock levels can either be entered as a number of items, e.g. 10,000 cases, or in Days of Cover (DoC), e.g. 14 DoC, in which case Preactor analyses the forecast and real demand over the next DoC period to determine the required stock level.
     
    The available capacity is also entered through a calendar system set up in either daily or weekly mode for each resource, where resources may be departments, cells, plants or entire factories.
     
    Typically the production load is backward scheduled, so Preactor will start by trying to load the demand onto the available resources into the week or day it is ideally required.‚ Preactor also includes the concept of a Make Window. The Make Window defines how early you are prepared to make the product because there may be shelf life issues to take into account. If capacity cannot be found within the Make Window, then alternative resources will be considered.
     
    The planner can then use the system to change planning parameters and capacity in each period to see the impact on deliveries, stock levels, and capacity utilization over the planning horizon.
     
    Please CLICK HERE to review more information on Preactor Advanced Planning and Scheduling System.